Re-tile order sheet: one room

Re-tile Planner · build.nineclip.com/systems/retile-floor-or-bathroom/

1. Tap test and the decision

Hollow tiles counted
Cracked tiles counted
Smallest door gap, mm
New tile thickness + bed, mm
Over the old floor / take it out

2. Tiles

Floor L × W, sq ft
Skirting length × height, sq ft
Tiles needed (+10%)
Tiles per box, boxes to order
Batch code, shade code

3. Bed material

ItemArea, m²Per m²TotalBags / cftBought
Adhesive, floor
Adhesive, skirting / wall
Cement (mortar bed + slurry)
Sand, coarse
Grout

4. Days

Old floor out and rubble cleared by
Laying starts
Grouting on (after the sheet's wait)
Full use from (about 14 days)
Spare tiles kept, how many
Source: CPWD DAR 2023, flooring items 11.41.2 and 11.44, checked Oct 2026. Planning estimate from CPWD and maker data; a civil engineer decides any upper-floor or leaking-floor question.