16 guides · 48 worked examples

Construction guides: checks on site, at the shop and on paper

Short guides for the checks a calculator can't do for you: what to measure when a truck arrives, what to read on a bag or a tank, and what to write down.

Quick Answer

Each guide covers one check you make on site, at a shop or on paper, such as weighing a steel delivery against IS 1786 or measuring a sand truck before it tips. It gives the rule from its Indian Standard or official source with the month we checked it, at least two worked examples, tips, and the calculator that does the sum. Use the calculators to work out quantities, then use these guides to check what arrives.

Before you buy: the plot

Tape the land, level on a slope, and compare it with the area on the papers before any money changes hands.

Part of the system: Buying a plot: check the area

Delivery day: check what arrives

Turn the bar bending schedule into a steel order first. Then check the four materials that come by the truckload, each before the load comes off the truck or the bill is signed.

Part of the system: Material order for one floor

Construction · 3 worked examples

From bar bending schedule to steel order: kg and bars for each size

Your engineer hands you a bar bending schedule. The dealer wants kilograms of each size. This guide reads the schedule's columns as IS 2502 lays them out and turns each row into a cutting length and a weight. Then it works out how many full bars to buy so the fixer can cut them with little waste.

Calculators: Steel Calculator, RCC Slab, Beam and Column Calculator

Source: IS 2502:1963, checked Oct 2026 · Updated

Slab day

The cover blocks and chairs to check the day before, the cube samples and the record sheet your engineer will ask for 28 days later, and how many days to keep the slab wet before the props come out. The slab casting day checklist ties them into the day itself.

Construction · 3 worked examples

Curing a concrete slab: how many days, how to keep it wet, and how long the props stay

IS 456 asks for 7 days of wet curing with ordinary Portland cement and at least 10 with PPC or slag cement. Here is the rule, a curing calendar, the water a ponded slab takes, and the earliest prop dates to plan your shuttering hire around.

Calculators: Concrete Calculator, RCC Slab, Beam and Column Calculator

Source: IS 456:2000 cl. 13.5, checked Oct 2026 · Updated

Construction · 3 worked examples

Cover blocks and chairs for a slab: how thick, how many, how tall

The structural drawing sets the cover. The blocks and chairs on site decide whether the slab gets it. This guide covers how thick each block should be, how many a slab and its beams take, how tall to bend the chairs for the top steel, and which blocks to send back before the pour.

Calculators: RCC Slab, Beam and Column Calculator, Steel Calculator, Concrete Calculator

Source: IS 456:2000 cl. 12.3.2, checked Oct 2026 · Updated

Water storage and drainage

What a sump or a plastic tank really holds, how to test your soil for a soak pit, and where the tank and pit can go on your plot.

Wiring

Plan the points and circuits before the walls are chased, and read an AC's nameplate before you buy its MCB.

Finishing

Ordering tiles from one batch and buying the right number of adhesive bags.

Part of the system: Re-tile a floor or bathroom

Where each guide fits in a build

Where each guide fits in a buildPlot: measure it against the record. Deliveries: steel, cement, sand and bricks. Slab day: cube samples and the record sheet. Water: sump and tank litres. Finishing: tiles and adhesive.1PlotMeasure it against the record2DeliveriesSteel, cement, sand, bricks3Slab dayCube samples and the record sheet4WaterSump and tank litres5FinishingTiles from one batch, adhesive bags
Where each guide fits in a build. The guides run in the order of a house job: the land first, the floor tiles last.
16guides
48worked examples
33sources cited, each with the month checked

Which guide to start with

If you're building now, read the four delivery checks before the first truck comes, and print the cube record sheet before slab day. If you're buying land, measure the plot first. If the house is already up, the tank and tile guides are the ones you'll use.

Tips and tricks

  • Most of these checks need only a 5 m tape, a 30 m tape and a phone calculator. Keep them on site.
  • Write the batch or lot number from each bag, bar tag or tile box on the delivery bill before you sign it.
  • Check before the material is unloaded or mixed. Once the sand has tipped or the bags are opened, a short delivery is hard to prove.
  • Every guide names the clause and the month we read it. Standards get revised, so if that date is more than a few months old, check the current edition on the BIS site.

Frequently asked questions

Are these construction guides free?
Yes. Every guide and every calculator on NineClip Build is free to read and use, with no sign-up.
Do I still need an engineer?
Yes, for anything structural. The guides cover measuring, counting and keeping records. Accepting or rejecting steel or concrete, reading cube test results and any design decision belong to your engineer.
Where do the rules in the guides come from?
From Indian Standards such as IS 1786, IS 269, IS 1077, IS 456 and IS 12701, CPWD specifications, state land-record offices and makers' data sheets. Each guide cites its sources with the month we checked them.
How is a guide different from a system?
A system plans a whole job, from the first decision to the records you keep. A guide covers one check inside a job. The four delivery checks, for example, sit inside the material order system for one floor.

Measuring, counting and records only. Decisions on structural material, concrete results and design belong to your engineer.