Material order sheet: one floor, three lots
Material Order Planner · build.nineclip.com/systems/material-order-one-floor/
1. Quantities and the thumb-rule check
Floor built-up area, sq ft
Concrete grade and m³ (drawings)
Steel kg by size (bar bending schedule)
Brick walls, m³ or wall area
2. Order sheet
| Material | Drawings qty | Thumb-rule check | Lot 1 | Lot 2 | Lot 3 | Delivered |
|---|---|---|---|---|---|---|
| Cement, bags | ||||||
| Steel 8 mm, kg | ||||||
| Steel 10 mm, kg | ||||||
| Steel 12 mm, kg | ||||||
| Steel 16 mm+, kg | ||||||
| Sand, brass | ||||||
| Aggregate, brass | ||||||
| Bricks, nos |
3. Lot dates
Lot 1 steel, needed on site by
Lot 2 slab day, on site by (2 to 3 days ahead)
Lot 3 walls, first delivery
Steel billing: actual / theoretical
4. Delivery log
| Date | Material | Bill qty | Measured / counted | Batch / cast no. | OK / sent back | |
|---|---|---|---|---|---|---|